A light dress followed by solid-tine down to 2". That brings the grand total over 100 ton of sand applied in the last 3 months. Hollow tining is planned for early August and it is hoped by the end of the season we may get to 200 ton across the whole site.
Our obvious weakness is wet, soft, diseased winter greens so the more sand we can incorporate into the surface the better winter quality will be.
Irrigation is now fixed and greens are responding well, getting back to better, smoother surfaces.
Dry areas |
Topdressing |
18th Lower |
No comments:
Post a Comment